Skip to main content
Main navigation
Home
About
What is UNNExT?
Advisory Committee
Advisory Groups
Contact Us
Experts
Expert Database
Registration Form
Events
Resources
Resources
Working Papers
Databases
Guides & Tools
Toggle navigation
Breadcrumb
Home
TPAD
Procedures
Trade Process Analysis Database (TPAD)
TPAD
Trade Process Studies
Case Studies
Procedures
Load container and transport to port (airport) of departure
Case Study
Title:
Export of Auto Spare Parts from Thailand to India, 2011
Corridors and Routes:
Not Specified
Trade Product:
Auto-parts
Trade Type:
Export
Process Analysis:
Export from Thailand
Exporting Country:
Thailand
Importing Country:
India
Category:
Inland carriage and handling
Country and Procedure Description:
Load container and transport to port (airport) of departure(Export from THA to IND/Auto Parts)
Related Rules, Laws and Regulations:
Actors and Participants:
- Exporter
- Haulage
- Port Authority of Thailand (PAT)
- Royal Thai Customs
Actors and Participants:
- Exporter
- Haulage
- Port Authority of Thailand (PAT)
- Royal Thai Customs
Input Criteria to Enter or Begin the Business Process:
-Cargo/products are ready for movement.
Activities and Associated Documentary Requirements:
1. Exporter to contact truck/haulage to pick up empty containers to be sent packing at the warehouse to a company vehicle preemption truck. 2. Truck/Haulage and receive a reservation confirmation. 3. Export makes an appointment with truck/haulage and prepare for packing goods entering. 4. Empty container is brought to the warehouse for packing. 5. Exporter controls sealed container. 6. Exporter prepares document. a. Request for permission for the container to the Port Area (TK 308.2) 7. Exporters prepares document for Thai Customs Department. a. Contain Slip b. Form KN.6.1 8. Thai Customs Department receives documents and verify. If they are not correct, the good transition control list reject will be sent back. If they are correct, the good transition control list accept will be sent back. 9. Exporter receives and prints out the container slip and gives to haulage. 10. Haulage moves contain to port. 11. Port Authority of Thailand (PAT) receives documents from Haulage and verifies documents. 12. PAT prepares Equipment Interchange Receipt (EIR) document and send to Exporter. 13. Haulage move container to the container yard
Output Criteria to Exit the Business Process:
-Cargos/Products are moved to Port Area.
Activity Diagrams:
Number of Required Documents:
7
Minimum Required Time:
Maximum Required Time:
Average Required Time:
0.25
Minimum Cost:
Maximum Cost:
Average Cost: